Back Study of Flood Prone Areas in Serbia – Phase 1
Identification details
Official title of the project Study of Flood Prone Areas in Serbia – Phase 1
Website /
Region/City Moravica, Pcinja, Rasina, Belgrade, Nisava, Raska, Pomoravlje, Branicevo
Sector(s) Flood Protection , Water Management, Environment
Budget / EC contribution 1,999,500.00 €
Implementation period 01 January 2009 - 01 January 2011
Expected results
  • Preparation of a draft methodology for flood mapping in line with the EU policies
  • Adjustment of Digital Terrain Model
  • Production of high resolution flood hazard and risk maps for the Project area
  • Production of a pilot case for integration of the flood risks information in local or regional spatial plan
  • Integration of flood maps into the Water Management Information System
  • Dissemination of the results and capacity building:
  • Transfer of the technology (know-how) Preparation of the long term concept for use and for regular 6-year update of the maps.
Beneficiary Ministry of Agriculture, Forestry and Water Management
Partners Eptisa Servicios de Ingenieria S.L. (100 %)
Contact details
  • Branko Mikasinovic
  • Project Manager
  • Alvaro Diez Santaclara
  • Director
  • Milka Tesevic
  • Project Administrator
Summary
Summary of the project
(up to 1500 characters)
Main goal of the project
(up to 800 characters)
Specific objectives
(up to 800 characters)