Back Waste Water Treatment Project-Sabac
Identification details
Official title of the project Waste Water Treatment Project-Sabac
Website /
Region/City Macva
Sector(s) Waste Water Treatment
Budget / EC contribution 18,135,000.00 €
Implementation period 01 May 2011 - 01 April 2013
Expected results To protect and improve surface water quality of the River Sava by treating the collected and transported industrial and communal wastewater.
Beneficiary Municipality Sabac
Partners
Contact details
Summary
Summary of the project
(up to 1500 characters)
Main Physical Project Components with brief Quantitative Indicators:
  • By-pass interceptor sewer, ending at the future wastewater treatment plant (o800mm, L=1950m).
  • Sewage pumping station (SPS) Glavna at the existing wastewater outlet (4 m3/s, 132 kW);
  • WWTP (wastewater treatment plant) – phase 1A for 84.000 population equivalent (PE).
  • River bank protection-reinforcement (1600 m).
Embedding in documented development strategies: National Strategy X; Regional Strategy X; Local Strategy X; Urban Master Plan X
Fact sheet - SR
Fact sheet - EN
Main goal of the project
(up to 800 characters)
  • To protect and improve surface water quality of the River Sava by treating the collected and transported industrial and communal wastewater. The project is in line with EU directives and with Serbian legislation and regulations.
  • Improve standard of service in wastewater collection.
  • Avoid pollution of both underground and surface waters, and serious health hazard by current use of sceptic tanks.
Specific objectives
(up to 800 characters)