| Back Waste Water Treatment Project-Sabac |
| Identification details |
| Official title of the project |
Waste Water Treatment Project-Sabac |
| Website |
/ |
| Region/City |
Macva |
| Sector(s) |
Waste Water Treatment |
| Budget / EC contribution |
18,135,000.00 € |
| Implementation period |
01 May 2011 - 01 April 2013 |
| Expected results |
To protect and improve surface water quality of the River Sava
by treating the collected and transported industrial and communal
wastewater.
|
| Beneficiary |
Municipality Sabac |
| Partners |
|
| Contact details |
|
| Summary |
Summary of the project
(up to 1500 characters)
|
Main Physical Project Components with brief Quantitative Indicators:
- By-pass interceptor sewer, ending at the future wastewater treatment plant (o800mm, L=1950m).
Sewage pumping station (SPS) Glavna at the existing wastewater outlet (4 m3/s, 132 kW);
- WWTP (wastewater treatment plant) – phase 1A for 84.000 population equivalent (PE).
- River bank protection-reinforcement (1600 m).
Embedding in documented development strategies: National Strategy X; Regional Strategy X; Local Strategy X; Urban Master Plan X
Fact sheet - SR
Fact sheet - EN |
Main goal of the project
(up to 800 characters)
|
- To protect and improve surface water quality of the River Sava
by treating the collected and transported industrial and communal
wastewater. The project is in line with EU directives and with Serbian
legislation and regulations.
- Improve standard of service in wastewater collection.
- Avoid pollution of both underground and surface waters, and serious
health hazard by current use of sceptic tanks.
|
Specific objectives
(up to 800 characters)
|
|